New build interior design

Custom home interior design, decided before the builder asks

For new construction around Lake Travis and the Hill Country. One plan for finishes, lighting and furniture, made in the order your build needs it.

Custom wood cabinetry in a kitchen under construction
When to start

The best time to bring in a designer is before the plans are final

A new build asks you for hundreds of decisions on the builder's schedule, most of them before you can walk through a single room. Some are cheap to change later. Most aren't. A plan made early puts them in the right order and makes them work together.

Plans, selections, cabinetry, tile, lighting, furnishings and shades, planned as one house.

Custom home interior design is a different job from decorating a finished house. On a new build, the decisions come early and in a set order, and each one limits the next. The builder needs tile before the showers can be waterproofed and cabinet drawings before the shop will start. Lighting locations are needed before the electrician roughs in. Miss a deadline and the builder picks a standard option so the job keeps moving. That is how a custom house ends up with builder-grade choices.

So the real question is timing. What follows is when to bring a designer in, what you'll be asked to decide at each phase, and what the plan covers.

When to bring a designer into a new build

At the plans stage, if you can. This is where a designer saves the most money. A furniture plan drawn over the floor plan shows whether the great room fits the sofa you want, whether the primary bedroom can take a king bed with nightstands on both sides, and whether the kitchen island leaves enough room to walk around it. Changing a line on a plan costs almost nothing. Moving a wall after framing doesn't.

Before your selections are due. Your builder will hand you a selections schedule with dates on it. There's still plenty of room to make the house yours at this point. Bring that schedule to your consultation so the plan is built around those dates, starting with whatever is due first.

After drywall. Still worth it. Furnishings, light fixtures, paint and window treatments are all ahead of you. Cabinets, tile layouts and electrical locations are mostly set by now, so the plan works around them.

What to decide at each phase of the build

  1. 01

    Floor plan and furniture layout

    Decide where the sofa, the beds, the dining table and the TV go while the plan can still change. The furniture plan is drawn to scale over the floor plan, so you can see if each room is the right size before the builder prices the job.

  2. 02

    Electrical and lighting locations

    Your builder needs these before the electrician roughs in: sconces, pendants, floor outlets for a floating sofa, the TV wall and any switches that control more than one room. The plan places each one against the furniture, so nothing lands off center.

  3. 03

    Tile, plumbing and hard finishes

    Tile often has to be picked before the showers are waterproofed, and plumbing valves before rough plumbing. Decide the tile, fixtures, counters and flooring together, and the plan gives your builder selections they can price and order from.

  4. 04

    Cabinetry and built-ins

    Kitchen, baths, laundry and mudroom. Cabinet shops need approved layouts early and have long lead times. The plan gives you a layout and selections your cabinet shop can price from, so the order goes in on time.

  5. 05

    Windows, shades and motor power

    Decide which windows get shades and which get motors while the walls are open. Hardwired motors need power run to each window before drywall, and shade pockets need framing. The plan marks every one.

  6. 06

    Paint, fixtures and furnishings

    Paint, light fixtures, rugs and furniture come last, but the plan sets them from day one so the finishes and the furniture belong together. After you approve it, full design and project services are quoted from the plan.

A kitchen design board with cabinetry, marble, brass lighting, hardware and wood flooring
A kitchen design board with cabinetry, marble, brass lighting, hardware and wood flooring

How a new build project starts

A new build follows the same path as every River Jane & Co. project.

  • A free 15 minute call. Tell us where you are in the build, who your builder is and when the first selections are due.
  • A consultation, in your home or virtual. Bring the plans and the builder's selections schedule, and we agree on the scope.
  • Your Design Strategy, from $999 per room. Layout, selections, a mood board and a 3D rendering, a 30 minute review call, and a final visit with samples. A whole new home or several rooms is quoted after the consultation, so you know the price before anything starts.
  • Full design and project services. Quoted from your approved plan: sourcing, ordering and design management at key milestones. The rest of the investment is tied to decisions you've already made.

Read what happens in a Design Strategy for the detail on each step.

Selections due soon?

Book a 15 minute call

Working with your builder and architect

A designer doesn't replace your architect or your builder. The architect designs the structure and the builder builds it. Your Design Strategy covers the rooms inside it: the layout, the finishes and the furniture, handed over as a layout and selections your builder can price from. You stay the one who approves every choice.

Watch the cabinet order. On a new build it can lock weeks before you've thought through how the kitchen will actually get used. Before it goes in, ask three questions: is there enough pantry storage, do the uppers need to go to the ceiling, and where do the small appliances live? You can see finished kitchens in our kitchen portfolio.

Where new builds go wrong

  • Lighting placed before furniture. Sconces off center on the bed wall, a pendant that misses the middle of the island, a chandelier that does not line up with the table.
  • No floor outlets for a floating sofa. Lamps then run on cords across the rug.
  • West glass with no plan for the sun. No blocking or pocket for shades, and no wiring for motors, on the wall that needs them most.
  • Allowances set too low. The tile and lighting allowances in a builder contract are often set before anyone picks the tile and lighting.
  • Too many finishes. A different tile, metal and wood in every room, because each one was picked on its own day.
  • Furniture ordered last. Custom upholstery can take months. If the furniture plan waits until the house is done, you can end up moving into empty rooms.
A primary bath under construction, with unfinished wood vanity cabinets, open shelves and a fireplace
A primary bath under construction, with unfinished wood vanity cabinets, open shelves and a fireplace

Building in the Hill Country

New homes out here tend to share a vocabulary: limestone and standing seam outside, white oak, plaster and iron inside, and a lot of glass facing a view. Carry the exterior materials inside so the house reads as one, and keep the interiors warm so the big windows don't make it feel like a lobby. Glass facing west over Lake Travis needs a shade plan before drywall, while motor wiring and pockets are still easy. The Shade Haus quotes every window in writing.

We work with new builds in Bee Cave, Dripping Springs, Marble Falls, Spicewood, Lakeway and Horseshoe Bay, all within about 28 miles of our Spicewood studio. For the whole range of what we do, see our services and pricing and whole home interior design.

Services and pricing.

Every step is priced before it starts.

All services

In-home consultation

About an hour on site

We walk the space, talk through what you want and set the investment and timeline before design begins.

After your call
Book this

Full design and project services

After your Design Strategy

Full design, sourcing, ordering and design management, carried out from your approved Design Strategy.

Quoted to your plan
Book a consultation

Questions.

When should I hire an interior designer for a new build?
Before the plans are final, if you can. A furniture plan drawn over the floor plan catches room size, lighting and outlet problems while they cost nothing to fix. The next best time is before your builder's selections are due.
Do you work with my architect and builder?
Yes, alongside them. Your architect and builder own the structure and the build. Your Design Strategy covers the rooms, finishes and furniture, with a layout and selections your builder can price from.
What does new build interior design cost?
It starts with a free 15 minute call, then a consultation in your home or virtual. A Design Strategy starts at $999 per room. A whole new home or several rooms is quoted after the consultation, and full design and project services are quoted from the approved plan.
Can you help if my selections are due soon?
Tell us the date on the first call. You'll get a straight answer on whether the plan can be ready in time, and which decisions to make first if the schedule is tight.
What should I decide first on a new build?
The furniture layout. It sets where the lighting, outlets and TV go, and those are due before the electrician roughs in. Tile and plumbing fixtures usually come next.
Do you handle window treatments on new construction?
Yes, through The Shade Haus: Roman and roller shades, cordless from $299 a window and motorized from $399 a window, depending on fabric and controls. Plan motor power and shade pockets before drywall. Every window is quoted in writing.
Where do you work?
Within about 28 miles of our Spicewood studio, including Bee Cave, Dripping Springs, Marble Falls, Lakeway, Horseshoe Bay and West Lake Hills, with Austin on the same terms.
Start your project

Tell us about your house.

Tell us about your home. It takes about two minutes, and we reply within one business day.

  1. 1Project
  2. 2Timeline
  3. 3Contact
  4. 4Call

What are we designing? Choose all that apply

When would you like to begin?

What is your project budget? Furnishings, construction and materials. Not design fees.

Where should we reach you?

We only use this to reach you about your project.

Pick a time for a 15 minute call.

A quick conversation with the studio about your home.

Skip, just call me

Your project brief

You're booked.

Before our call
  • A few phone photos of the spaces
  • Any inspiration you have saved
  • Floor plans, if you have them